Wednesday, December 24, 2008

Trip with a Van

Van trip

Roy & I hired a van for 2 days to transport some bulky items to EPW. There may be 5 people there at New Year, so we needed to sort out a sofa, some mattresses and a table. We picked up a van at 11am on Monday, then went to Ikea to fill it up. There was a slight hiccup, in that the sofa we wanted wasn't in stock, so we had to delay that part of the purchase until 12pm on Tuesday. Anyway, we got everything eventually (including some bunk beds for a friend of mine in St Andrews) and set off at lunchtime to head to EPW. After a brief lunch stop at the Highland Harrods we made it to the Wood just as it got dark. There were about 20 deer lurking outside the house but they made off after staring at us rudely for a bit (I imagine that they were offended at our intruding on their land).

The van was unpacked and the contents dispersed thinly throughout the house. I sorted out the sofa and Roy tackled the table - both of which look very smart (although the table is only an interim one and will ultimately end up being a desk in the study / downstairs bedroom).

We then headed back to St Andrews for the night, to pick up Emily who is staying with R&C in Edinburgh for Christmas, and to drop off the bunk beds with Rebecca. Back in Edinburgh we used the van's capacity to carry a Christmas tree (only £10 when bought on Xmas eve!) and my bike, which had been being serviced, before returning it 30 mins before the rental ran out. Very efficient.

Tuesday, December 02, 2008

Snowy visit

November at the Wood
Cecilia entreats you to ignore the photos of the loo seat (if she hasn't already deleted them).

Sunday, November 30, 2008

Weekend visit

They're off to EPW for the weekend. I DO hope that they've taken some photos / have something to report after this trip.

nudge nudge it's been quite a while since the last update...

Monday, November 03, 2008

Tuesday, September 30, 2008

Downstairs

Photos from the Final Meeting

EPW The "Final" Meeting
C will put comments on this evening.

Monday, September 29, 2008

Upstairs



I'll put the downstairs one on this evening.

The Final Meeting (or so they say)

We went to the Wood today for The Final Meeting with Mary and Alasdair (whose name I can now spell). We had a list or two; Mary had an Agenda; and Alasdair had identified a Mystery Flaw which I had certainly not spotted, though maybe the others had.

We discovered that because the road was a provisional sum, we would have to spend another £2000 or so to tarmac the entrance. But we were given Certain Information that we are not at liberty to divulge, and which Janet would kill us for acceding to, so this problem may disappear.

We mystified everyone by our incredibly accurate, logical (Roy) and lawyerly (me) reading of the so-called Acceptance of Completion Certificate. There will be documents to chase, I fear, in order to make all the paperwork line up tidily with our title deeds and the planning permission, which stipulates that certain things never seen in writing before by either Mary or Alasdair will have to be obtained from the planning department once certain other things have been done. Aargh red tape.

We wandered around checking that the paintwork was as we wanted it to be; and Alasdair showed us a narrow strip of sliding door upstairs that had not been painted grey. We saw that the holes for hi-fi wires had been made; and Roy immediately said he would have preferred not to have them. He was throttled. The tiny tiny gap between the north windows of the kitchen is to be plugged with a fillet on the outside. The access track is to have a couple of loads of gravel at the steeper and curvier bits. The Velux blinds are to be obtained and fitted by Alasdair. Mary's assistant Robert is organising the replacement loo lids. Alasdair's chaps will fix some clothes airers in the utility room. We acquired some keys. We agreed that we could manage without the other shelves at the back of the kitchen. And so on and so forth. Essentially, the project is just about complete. But we discussed the next thing: a shed for wood and stuff: next year's project, is we are spared.

We moved various odds and ends in: a kettle, mugs and plates, a coffee pot, one chair. We made the first pot of coffee. It was horribly rainy, so we did not saw up the pile of tree that we had been intending to tame.

It is all a bit of an anti-climax, given the economic climate. Whether we ever live there is moot, it seems; and we are rather gloomy. But Livy took some nice pictures; and it is a lovely place.

Saturday, September 27, 2008

Is a Lid a Seat?

This is the lavatory lid story to date.

The lavatories are very pretty: cantileverd, a nice smooth oval, very plain. (The flush mechanism is a little maximalist and curvy; but there is a reason for the large size: it means that plumbers can get at the pipes through the hole left by the flush mechanism when you take it out. The flush mechanism that Mary has in her house is smaller; but hey we have a lower specification. Grr.)

Unfortunately, the lid of the downstairs loo cracked right across when I sat on it to rest my limbs and take a photograph. And it was later discovered that one of the upstairs lids had also broken at an unknown time and by an unknown agency. Anguish. A lid breaking problem in our lovely new house.

I called Ideal Standard and received some of the best customer service I have ever experienced (as I told the woman). I had quite expected to be told that I should Go Away Because Lids Are Not Seats.The story is, apparently, that they have had problems with some but not all of these particular lids. It is a Tremendous Secret; and they have gone so far as to bring in a university to investigate the problem. (Line of exclamation marks.) This is, it seems, the absolute final last ditch solution to problems with lids.

When supplied with the address of the house, the names of the builder and the supplier of the loos, the invoices, our mothers' maiden names and so on, Ideal Standard will issue us with a magic number the effect of which is that we will have free replacement lids for ever and ever.

Mary's assistant Robert is dealing with it all. So far we are not aware of any glitch having intervened.

Friday, August 29, 2008

Nearly at Practical Completion, we think

Just a handful of pictures from last Tuesday. It seemed that nothing else had been done since our last visit; though there are still some matters to clear up - the holes for wires down the backs of the shelves, squeezing the washing machine and the fridge freezer into their tiny spaces, fitting the Velux blinds, replacing TWO broken loo lids, tarmacking the entrance to the drive. The whole place is rather dusty and full of sawdust, waiting for the cleaners; but it could pretty much be lived in now.
The Wood
On Thursday we met Graham Moss there, the heat pump man; and he programmed the Nibe timer for us and began to explain how it is all controlled. We have sheaves of instruction manuals and he is expecting us to call him for explanations when we are in residence.

We need a working party to help saw logs. Any offers?

Saturday, August 16, 2008

Nearly finished, perhaps.

The Wood, 11 August 2008

We have been to the house twice in the past week: Monday and Friday, on the way to and from Runival. The photos which I think I will be embedding are of the first visit. A pity, now I come to think of it, as there had been some changes, as one might have expected, between the two visits.

On the first visit the electricians were in, along with Alistair's brother Donald, who is his site manager, I think. Donald is quite sure that the shelves under the back window in the kitchen were cancelled. Not by us, but we may just live without them. We rather improperly (such things are meant to come from the architect) confirmed that we would prefer white sockets in the shelves at the back of the island, rather than the metal ones which were originally planned to go into the wood at the ends, which we thought was too lovely to cut into. We mentioned the hole needed to take the wires down from the hi-fi shelves. (Still not done by Friday but it is a small thing.) We were a little surprised at how far the little round lights on the stairs stick out; but by Friday we were used to them. This is a psychological phenomenon.

I broke the lid of the downstairs lavatory by sitting on it. Bad lady.

By Friday, the wood tops to the shelves behind the loo and the bath in the bathroom had been fitted, and very handsome they look.

The grey doors, for which Max is taking ALL the credit, and let's humour him, are just the thing and I am prepared to bet that Mary will like them too and we may see them in other Dualchas houses.

Perhaps the most noticeable change is outside, where all the crisp packets, odd lumps, bits of plastic and crisp packets have been buried in gravel. It is not quite as I had envisaged it on the south side, but it does look smart. Some top peat, if I may call it that, has been moved from other parts of the site to around the house. It will need to be redistributed a bit; but it is an improvement. I was very pleased to see that many of the raw bits beside the track and where the original abortive track was tried, have greened up very well.

The well head has been buried, which I think is a pity, though it will save on the cost of building a lovely stone pyramid or other allegresse.

I have taken some videos, at Diana's suggestion; but as Livy is in Seth Efrica I can't upload them.

Monday, July 28, 2008

July Visit

We went to the Wood with Livy and Andrew on Saturday. Pictures below.

The Wood, C's photos

There were some queries: whether the kitchen unit doors look a little odd; whether I can bear the light switches; whether Roy can bear the bath; why there is a lot of condensation in unexpected places related to the Nibe; whether there has been sufficient thought given to where the wires go from the hifi shelves and from the things plugged in at the left hand end of the kitchen bench against the wall; why there are no shelves under the window at the back of the kitchen and where the bathroom towel rails and mirror lights are going.

But in general it was all looking rather super. The walls are a nice neutral and not brilliant white; the wall tiles in the bathrooms are a lovely pale grey; the oak floors upstairs and the elm worktops downstairs look gorgeous; the built in shelves are excellent and capacious; the shelves in the warm cupboard are spot on, and though there is space for them to be bigger, that space can also be used for other things; the shelves over the hanging spaces are generous.

The projected completion date of the beginning of September looks possible now. How we furnish it then becomes a question.

Sunday, July 27, 2008

Friday, July 25, 2008

A Digression

Shall we have one of these?

http://www.ruuttub.eu/eng/ruuttub

Livy - can you embed something here, by way of a picture?

Visit the site; wander around it; marvel at the language; parody it in your comments; enjoy. We are off to the Wood tomorrow and unless we forget the equipment there will be pictures thereafter.

Sunday, June 22, 2008

The Longest Day

We were there again today and found some good and some bads things. Good first: joinery galloping ahead with doors, upstairs skirtings and architraves. The shower floor has been much improved with smaller tiles, not quite as we originally envisaged it, but tolerable.

Visit on 22 June

The bad things: there seem to be two air intakes missing for the Nibe, which means, we think, that the warm air from the sitting room (where the wood stove will be) and the utility room will not be used. The kitchen lights and oily air extractor are still wrong or not there. The Legs really are a bit intrusive and we hope to become a hexapod rather than an octopus.

Outdoors, there are some cheerful signs of the devastation greening up.

Saturday, June 14, 2008

Tiles, Upstairs Floor and More about Legs

Mary made a site visit last week. She says the shower tiles have been re-done in a smaller size; and if we don't like it we must say. If we say, I suppose she will become even fiercer. She says the floor upstairs is jolly nice. We had agreed with her that wax, including the white Scandinavian wax, is much nicer than the varnish that Alistair was proposing as being more durable, which it may well be. No tackety boots upstairs, then. Mary thinks that we may be able to manage without the end Legs, and she is asking an engineer about this.

This last bit seems horribly long - waiting for the electricity and plumbing, and for the kitchen to be finished. The cabinet maker, though very good, is slow. So maybe we won't commission a table from him. We have decided, too, not to have a sort of semi-freestanding set of shelves under the window on the back wall of the kitchen, of wood, by Stuart the cabinet maker, which Mary was wondering about, but to compromise with a slab of his elm on top of the white built in shelves.

Wednesday, June 11, 2008

Tiling and the Nibe

We understand, from friends who dropped in at the Wood recently, that the tiler is having a perfectly frightful time with the bathroom floor. We did not know that Max's strong opinions were shared with anyone other than ourselves. Perhaps Mary had remonstrated. Anyway, the shower floor is being redone and the tiler has vowed never to work with big tiles again.

The Nibe has been commissioned, which makes it sound like a nuclear power plant. We will be given a seminar in how to use it, sometime.

Tuesday, May 27, 2008

Late Spring Visit

We spent three days in brilliant weather at Runival and visited the Wood on the way home. Here are the pictures.
Visit on 26th May


Most of the ground floor is now tiled. Upstairs there is still no finished floor; and there is lots of wiring and plumbing still to do. Some of the wires are still in the wrong place (the kitchen lights); and the kitchen extractor also still needs to be re-sited. The walls have been painted a less pink shade, in parts, though, which is a welcome improvement. We admired the tiled floor of the shower.

As we have given our final instructions about the bathroom wall tiles (though we thought we had done that some time ago), we hope that the tiling will soon be finished and that the plumbing might follow.

As usual, we all gravitated to the south windows; and when we were upstairs we all stood waist deep in the bedroom windows admiring the mountains. We were quite impressed by how well the brise soleil, which we are learning to call the canopy, to avoid pretentiousness, was preventing the house from heating up in the baking sun, which had completely dried out all the places where I have spent such merry hours disappearing to the tops of my boots and being rescued.

I wish I had taken a proper picture of the blood curdling label on Klarg's lid. It reminds one not to walk on the lid in case one is tumbled into the rotating machinery below. The subterranean part of this place is as interesting as the bit above ground.

Wednesday, May 07, 2008

We Name This Wood

We have more or less decided, it seems, to eschew Gaelic and to call the house East Poulary Wood. It seems more or less to have named itself. Anyone disagree?

Tuesday, May 06, 2008

Staircase, tiling, brise soleil

We went to the Wood on Saturday. The staircase is in, looking lovely. But I am a bit worried that Ronnie the Stair God has not brought the top step up high enough to allow for the full thickness of the upstairs oak floor, which is meant to be a nominal one inch thick.

Visit on 3 May


The brise soleil was in. It was a little disconcerting, realising how much it cuts off one's upward view out; but I suppose that is what it is for. The house was really warm, on a fairly overcast day; and in high summer it could get very hot without this shading. It was jolly nice being able to see out of the window at last, as the plastic has been taken off.

The tiling has started in the sitting room. We were rather sad that it is being laid with what look like rather over-generous spaces. In Mary's house, the tiles are fitted right up against each other, and that is much more handsome.

We dropped in on Alistair en route, to give him the electricity bill we have been sent. He mentioned how good and plentiful the water supply is.

Friday, May 02, 2008

There Are Always Things To Decide

We put a few questions to Mary after our last visit - the kitchen lights, the shower seat; and she did one of her visits last week to sort some of these things out. The lights are to be put in their proper place over the island bench; there is to be an oily air extractor over the hob, not just somewhere random in the kitchen. (This is so that Nibe doesn't choke.)

The piece of mahogany that we offered for the shower seat has been reviled, spurned and threatened with immolation. I have stamped my tiny feet and waved my tiny fists and insisted on a proper bench, not a flimsy hinged thing, ready-made. People who work with wood are just going to have to run along and find the necessary wood, even to the extent of flattening a rain forest. I have now got to the stage where I Do Not Care.

Mary is apparently having to make her opinions known to Alistair about the colour of the walls and also about something that has been done not quite right with the wood cladding on the south side. She won't tell me what it is. I do not want to know; that is what architects are for.

The latest question relates to the wall tiles in the shower room - should they be the same dark greenish grey as the floor? Mary thinks yes; I think no. If anyone has any views, could they let me know soon? What we have in the specifications is off white matt tiles in a nice big size.

Mary says the staircase is done. She has started to wonder how the south side is to be landscaped - one of my longstanding preoccupations. How about a pond outside the sitting room?

We are off to Runival again tomorrow, so there will be more pictures at the beginning of next week.

Friday, April 11, 2008

Two recent visits


We spent a few days indulging in Extreme Housekeeping at Runival earlier this week, and visited the Wood on the way there and on the way back, which was on a weekday, so we saw chaps working. The harling and the wood cladding are now done; and the harling has been painted on the south side, where the brise soleil was being bolted together the second time we were there. The water was turned on - gushes and gushes of it. I find it hard not to think that this is simply emptying the pool down below, though I know this is not how aquifers work.

Ronnie the Stair God was there making stairs; chaps were painting the walls.

Out
The Wood, 5 April 2008

Back
The Wood, 10 April 2008


We are now waiting to see if the mahogany will be enough for the shower seat; and we also wonder if the kitchen lighting is quite right. But Mary is on holiday, so we will have to wait to discover both those things.

Friday, April 04, 2008

Compare and Contrast: Exterior

Nov07

Dec07

Feb08

Mar 08

Easter 08

Compare and Contrast: Interior

From Sitting room towards the front door. (West to East)
Nov07

Dec07

Feb08

March 08

Easter 08

Compare and Contrast: Interior 2

Interior: East to West
Nov 07

Dec 07

Feb 08

March 08

Easter 08

Elements







Sink (big) - Franke GAX 110 45









Sink (little) - Franke ARX 110 35













Oven Hotpoint SE661X














Hob - Bosch PCD615FEU

Thursday, April 03, 2008

Kitchen plan


Mary has sent the plan of the kitchen that is to be made by her furniture maker on Skye. I hope you can make it out. The stuff is to be made of wood, mainly painted; but the bench tops will be elm, from a tree that he knew when it was growing, which is nice.

He makes real furniture too. Mary has a table and a bed by him, designed by herself. They are jolly nice but expensive. I have a sort of long term plan for a window seat; but that will have to wait in line after the deer fence and the boat or boats.

Off to Runival for a week tomorrow. There will be more pictures of the house when we return, I hope.

Sunday, March 23, 2008

Easter Day visit

We went to the Wood with Ursula today. There is now a front door, which was locked; but we cunningly found the key. The door is very solid and Scandinavian; but it seems to be made of metal, and I thought it was going to be wood.

Easter Day visit


All the walls now seem to be in place, and the Ames taping has started. We are beginning to get a feel for the rooms. The sitting room is very high and its window is rather overpowering. There seems to be acres of space in there, enough for about three sofas and two pianos. The wood stove has been installed and the stainless steel chimney pipe is in. The electricity wires are still in mysterious places, such as behind where the sliding door to the utility room will be; but we are sure all will be well in due course. Ronnie the Stair God has not yet made the stairs. For the stiff, using the ladder is a bit scary. We can see where the storage places under the eaves have been put in. Sadly, the insides of those places have not been finished off, which rather bothers me. What is the point of little cupboards that just lead into nasty little places that are impossible to keep clean, surrounded by insulation? On the positive side, though, the clothes hanging places between the main bedroom and the bathroom are nice and big, and the linen cupboard is huge. The downstairs windowsills are there but they are odd banal little things and I can't believe they are what were intended. So there are several things to take up with Mary.

The access track is firm, but it needs some tidying up. Some of the devastation is settling down a bit, though the main embankments are still frightful.

Wednesday, March 19, 2008

A Useful Place


We didn't manage a trip to the wood with Esther, as the Flying Refrigerator had a pain in its little inside; but here is a plan of the utility room. I have asked for a single sink bowl, and drainage by way of grooves in the bench top. I still don't know what the kitchen itself will look like.

We hope to have some more interesting pictures than this next week, if the forecasted bad weather does not prevent our trip to Runival for the Easter weekend.

Sunday, March 02, 2008

We Have Been Upstairs

We went to the Wood on 1st March, and the photographs show what we found: blockwork on the walls; the larch cladding started on the extension; electric wires all over the place; some downstairs walls; the fireplace wall; the first stage of ceiling throughout the ground floor; the first stage of flooring all over upstairs; the insulation in the walls downstairs and in some of the roof upstairs.

Some photos from Cecilia:
Visit on 1 March 2008

From Livy
The Wood March 08


There was a young joiner working on the inside of the roof, with his brother helping. I am embarrassed that I didn't ask their names (must find out from Alistair); but he was very engaging and charmingly ready to explain anything we asked about. He seemed very competent and he spoke with some awe of Ronnie who will soon be making the staircase - another Invergarry man whose expertise at stairs is legendary, and whose own new house is just opposite the Post office.

We opened the upstairs windows and looked out at the views, which are pretty nice. The upstairs spare loo has a window that will take up almost all of its ceiling, which will be interesting. I can imagine sitting there with the light off on a clear night, watching the stars.

The Nibe's ducting is sensibly running along the north side of the eaves, but there is still space in the south eaves for concealed storage, which still has to be sorted out.

One thing we need to sort out, as those who bother to read photograph captions will have noticed, is what to call the two main sides of the house. Naturally, I think, the side facing the road is the back - one would not want to have the main front facing the road. And so, of course, the front door is at the back. Well, that is an unimportant detail. But the logicians in the family want consistency.

We walked around in the wood a little, beginning the process of finding paths and sitting rocks. It was very wet and rather cold, and nothing much was growing yet.

The next trip may be when Esther is staying, if she can bear it.

Monday, February 11, 2008

A Roof that Apparently Does Keep the Rain Out

We went to the Wood again yesterday. It was a misty day and the views were not inspiring. There was still a lot of mud and mess; but things were looking good. There is now a real slate roof, with real steel gutters; and Alistair has worked out a nifty way of doing without extra downpipes on the rear wall where the little roof over the extension is shorter than the main roof. Alistair had left the house open so we could see that the floor has been screeded, with pipes set underneath it for the heating. We could even see where the mat well (that important feature of civilised living) will be. The first stage of part of the ceiling was also there; and so we were able to get a feel for how high the downstairs rooms will be.
The Wood February 2008

I took lots of pictures, but they are not here yet as I have forgotten to bring the relevant bit of wire to St Andrews. I'll put them on later (like now! - Livy). Roy took his camera, but it gave up after half a dozen pictures, as before. But the good news is that we were accompanied by a visiting American scholar, interested in fishing and the Highlands, who seemed very happy to sit in a car for eight hours as the price of seeing a bit of Scotland. He has put some lovely pictures on his blog: http://james-caldwell.blogspot.com/
I particularly like the panorama of the house in the site. There are also two nice video clips (not of the wood) - one with an unexpected narrative including bits about capercaillies. Do look.

We thought the house looked huge. Of course, there are no internal walls yet, so it would, wouldn't it? The utility room is a bit small; but it will do the job. The piano alcove is big enough for two uprights; and the overhead light for my music looks excellent. All the damp timbers seem to be drying out nicely. We were a little bit worried that there didn't seem to be enough space in the timber frame to squash in our 200mm of insulation; but Mary has reassured us about this today. Outside, we saw that the borehole has been tidily cemented. The nymphaeum, like everything else, needs landscaping, of course. Roy thinks he knows where he is going to put his cellar. I think I know where we will be beginning to make our straggle of outhouses, woodsheds and so on.

So the only thing to worry about now is planning permission. Please go on praying.

After we had poked around the house, we walked down to the river, as Jim wanted to decide whether to come back with a fishing licence. I think he might. There are a couple of recently fallen trees which will need tidying up. I have found a very good stone for sitting on and I am planning where to put benches and other sitting (as opposed to standing) stones.

We agreed that the new site is a great improvement on the old one: more connected with the pretty part of the wood, further away from the nearer neighbour, standing well up and commanding better views than from the meadow.

The other news is that we might be changing the name of the house. Roy discovered that tiodhlag has associations with funerals and burial. So? Anyway - we are in discussion about this, and will let you know what piece of interesting spelling we finally hit on.

Wednesday, January 16, 2008

Meeting with Alistair

On the way back from Runival we stopped at Alistair's place to give him a bottle of whisky. He lives just by the road to Invergarry from Spean Bridge and his place is full of JCBs, other pieces of building equipment, tremendous sheds and lots and lots and lots of gaily coloured toys for small children.

We had told him we might be dropping in at the Wood, if that would be all right; and he had terribly kindly undone the wood covering the front door (see last posting); but we hadn't stopped on the way back and so we felt he had gone to that trouble for nothing. In any case, I would have been afraid of doing something bad and breaking something if we had gone in without his being there.

We talked about getting the electricity in, which he had in hand. Apparently the Hydro don't like making more than two hookups in any period of six months, as they have to compensate people for the supply being turned off whilst the hookup is being done. He knows the chaps, though, and he was hopeful that it would be done sooner rather than later. It seems he may be right about that, as when we contacted the electricity board today to say which tariff we would be wanting they said that had already been noted. It must have been Alistair who told them, I think.

We were talking in general terms about how soon he would be needing to know any final details about electricity; and he said mid-January. So I have rather shame-facedly been going back to Mary about putting in more light and power. We really ought to have done this before the plans were finalised; but there were all sorts of deadlines and we just went with the flow in order not to slow things down. Oh well, I hope it won't come in as too much more, though of course there will have to be an AI with plans. It has been quite jolly looking at the online catalogue of light fittings and discussing what I prefer. Roy has very kindly stepped back from this discussion - he feels sufficiently stressed out by financing the project.

The main topic of interest was the well. He gave us the driller's log, which shows that the first three metres of hole went through sand and gravel, and that the drill then hit granite, which it proceeded to chew through for another two days to a depth of 140 metres. They put a metal pipe in the top part and then perforated tube below. At first, there was very little water; but Alistair encouraged them to dig a bit deeper and then they found 80 gallons an hour, from below sea level.

He said they had brought up three tons of fine grit, some of which we saw beside the hole, in the nymphaeum. Such grit is said to be very fertile, but I am not sure where it has all gone. Perhaps they have carted it away. If not, I will scatter it in chosen parts.

Alistair also told us that the slaters were to be coming the following day; and as I write I think they may actually have finished by now. Mary will be going to the house on Friday, to do another valuation; and we hope to have some pictures from her then.

Thursday, January 03, 2008

Last Visit of 2007

Photos:
All Windows

We went to the wood on the way to spend Hogmanay Somewhere Even More Remote. As it was the last day of the year we were right in not expecting to find anyone at work there.

The house is now completely house-shaped. It has all its structural parts; and the windows are in, which shows that Nordan were spot on in their delivery schedule and Alistair in his ordering. (See earlier posting about windows.) We couldn't really see what they were like as they were carefully protected by thick plastic held on by battens of wood. We couldn't get in as the front door hole had been closed with a piece of wood.

The surroundings are still pretty similar to what I understand a First World War battlefield might have been like on a less frantic day than most: some trees uprooted; others bravely withstanding miscellaneous piles of earth heaped around them; wastes of bare earth and stones; pieces of wood and stuff; the odd piece of slightly heavy machinery; water both standing and flowing; places where things have obviously been buried; signs of fire (including one which has made one of the few remaining trees from the ex-knoll look even more maltreated).

The nymphaeum was exciting: a pipe standing out of the ground; a very deep puddle shaped like a bath; heaps of stuff looking like slightly set cement (see next posting for an explanation of this). The nymphs weren't exactly dancing there, as it was too cold; but there were definite signs of their being about to take up residence. In fact, I realise that we will need a little shrine there for them. So if anyone knows someone who designs houses for lares et penates and miscellaneous pagan deities, please advise. I will not be perfectly happy about the security of the water supply until we have sorted out this bit of the design. I think Mary, who is happy to do garages and outbuildings, might find such a commission a little outre. A tholos, perhaps. Or would they want something more enclosed in the Highlands? Something like a broch? We could keep watering cans in it. It would need spaces in the walls for candles like the wall at Winchester.

Which reminds me that we will be needing a woodshed sooner rather than later. Also friends with chain saws. So can I also send out a request for those? I have an idea about a woodshed against the downhill slope of the entrance causeway which seems to be taller every time I look at it with the eye of a landscaper. To the drawing board for that. We wonder about a long weekend with a chainsaw in March, to rid ourselves of the most reproachful piles of dead trees.

There were stacks of slates and blocks at the back of the house and at the side of the road. Exciting. (Amazing what one can find to get excited about.)

The track was looking good: only showing fairly minimal signs of run-off and only a few places looking churned up where something biggish had made a mess. Otherwise, though, there is a dire need of landscaping and planting, and therefore deer defence. Getting down from the house and the track into the rest of the site is a bit of a challenge at present, because even with the laudable intention of snuggling the house into the hillside, when digging away a knoll there is only so far you can go before you start to do quite serious damage. So there is a slope a bit like the one at Kimpton down from the house to the lawn, but higher, from the terrace at the south side of the house; and the track, as I have said, is on a causeway. The slopes are a mixture of gravel, bigger stones and peat and I will have to get a Ph testing kit to work out what will go on them.

Anyway - that was that visit. Pictures will follow when Roy has forced his camera to give up its hostages. It packed up long before I had captured all I wanted to. (I had left my camera in Edinburgh. Silly.)